Journal

Field notes on importing from China.

What we wish someone had explained to us plainly, early on. Short field notes, no jargon, drawn from what we see on the ground.

Seasonal

Chinese New Year 2027: 6 February, and why you should order by December

Chinese New Year 2027 falls on 6 February, nearly three weeks earlier than in 2026. To be produced, inspected and shipped before the workshops close, an order must be locked in by early December 2026.

Read the note
Freight

Where China-Europe ocean freight rates stand in the summer of 2026

As of 2 July 2026, Drewry's index puts a 40-foot container at around 4,682 dollars from Shanghai to Rotterdam, rising and volatile. A useful market benchmark, as long as you do not mistake it for your landed cost.

Read the note
Regulation

CBAM (the EU carbon border levy): who is actually concerned

CBAM covers only six families of materials, not furniture or textiles. Below 50 tonnes of covered goods a year, most importers are exempt.

Read the note
Trade fair

Canton Fair, autumn 2026: dates, phases and how to prepare

The 140th edition runs from 15 October to 4 November 2026, in three themed phases. Knowing which one covers your product is what keeps the trip from being wasted.

Read the note
Incoterms

EXW, FOB, DDP: who pays what, and how far

The Incoterm decides where the supplier’s responsibility ends and yours begins. Pick it at random and you discover costs on the dock.

Read the note
Quality

Quality control is won before loading

A defect found at the factory gets fixed. The same defect found on the dock in Europe is paid for in full.

Read the note
Trade fair

The Canton Fair, or thirty thousand factories in a few days

Twice a year, most of China’s export industry gathers in one place. Well prepared, it is a shortcut of several months.

Read the note
Customs

Customs duty and VAT: what really lands on arrival

The factory price is not the landed cost. On entry into the EU, two lines almost always get added: customs duty and VAT.

Read the note
Lead times

How long, really, from sample to container

"When will I get my goods?" The honest answer is three blocks you add up, not one magic number.

Read the note